Here we list some of our main works. Click on the name of each work to open and close its information and also to access our technical collection PDF files, with the certificates of technical capacity of RM Engenharia provided by our clients, as well as work photos.
Client: Arlanxeo Brasil S.A.
Budget: approximately US$ 147.750,00
Construction services for the “Cooling Water” project implantation, including, among others, construction of several pile-driven reinforced concrete bases and sleepers, supply and assembly of metallic pipe supports and reinforced concrete structure strengthening, at the Duque de Caxias Plant, from July to December 2018.
Client: Arlanxeo Brasil S.A.
Budget: approximately US$ 413.780,00
Construction services for the NBR project implantation - “NITRILE BUTADIENE RUBBER”, including, among others, pile-driving, reinforced concrete bases/sleepers/paving, metallic platform and hot-dipped galvanized lifeline structure, reinforced concrete dam adaptation, anti-corrosive acetic acid resistant coating, at the Duque de Caxias Plant, from December 2018 to January 2020.
Client: Arlanxeo Brasil S.A.
Budget: approximately US$ 497.960,00
Construction services for structural recovery of reinforced concrete, including, among others, structural recovery of reinforced concrete columns, beams, slabs and bases, at the Duque de Caxias Plant, from May 2016 to August 2020.
Client: Arlanxeo Brasil S.A.
Budget: approximately US$ 5.044.655,00
Project, construction, expansion and renovation services (*) of industrial units, administrative buildings (offices) and operational support (cafeteria / auditorium / control rooms / truck scales / fitness center / internal and industrial safety / hospitals / laboratories ), concrete bases for static and dynamic equipment, treatment plants, industrial ducts and common areas (paving, networks, fencing), at the Duque de Caxias Plant, accumulated in contracts between April 2016 and August 2020.
(*) Earthmoving and leveling, manual and mechanical demolition of masonry and concrete structures, reinforced concrete/metallic infra and superstructures for buildings, sheds, concrete bases of static and dynamic equipment and industrial ducts, finishing services (masonry / floor and walls coating / painting / partition walls / linings / frames / hardware), building installations - electrical, plumbing and sanitary, paving (concrete / paving stone / asphalt), infrastructure networks (electrical, water, fire, sanitary sewage, pluvial and greasy drainage, and industrial waste), roofs (fibercement / fiberglass and aluminum tiles), waterproofing (asphalts and aluminum membranes), special coatings, urbanization (fencing), installation of metal anchors and equipment grout.
Technical Capability Certification [PDF - 2.027kb] --- Photos
Client: Nova Transportadora do Sudeste S/A - NTS
Budget: approximately US$ 154.000,00
Deadline: 180 days
Project Services (architecture, concrete and metallic structure, hydrosanitary, pluvial and electrical installations) and Construction of Shed in the Forest Garden of Guaratiba, including, among others, preparation of the site, topography, pit opening, concrete structures (infra and superstructures), fabrication and assembly of metal structures, metallic roofing, masonry and cladding services, hydraulic and sewage installations, rainwater harvesting and effluent treatment installations, electrical and lighting installations, with completion in December/2017.
Technical Capability Certification [PDF - 1.138kb] --- Photos
Client: BRASKEM S/A
Budget: approximately US$ 240.000,00
Deadline: 180 days
Construction of the containment basin (floor and dike) for the installation of an effluent treatment plant (BIOX), including, among other services, surface stripping, compaction, terrain preparation and trimming, clay periphery slope, concrete collector box, stone dust subgrade and sub-base, geomembrane and geogrid installation, gravel base, halfround drainage ducts and concrete bases, at UNIB 4 DCX/PE 9 DCX, with completion in March/2017.
Technical Capability Certification [PDF - 1.022kb] --- Photos
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$790.000,00
Deadline: 210 days
Project, construction and electromechanical assembly, for adaptation works of the sanitary effluent treatment station, including the implementation of the sewage, electrical and instrumentation (HDPE, PVC and CPVC pipes, channels, junction boxes and concrete elevators) infrastructures, supply and installation of electrical and instrumentation cabling, adaptation and interconnection of the CCM drawers, indirect foundation, supply and installation of storage fiberglass tank, supply and installation of electric and pneumatic pumps, supply and installation of instruments (level switches, control valve, manometers, ...) and control panel (CLP), as well as commissioning and pre-operation, at the Gov. Leonel Brizola Thermoelectric Unit in Duque de Caxias, completed in August 2016 .
Client: Petrobras Transporte S/A. - Transpetro
Budget: approximately US$760.000,00
Deadline: 150 days
Project, construction and electromechanical assembly, for adaptation works of the lighting system (poles), including the infrastructure (HDPE piping and junction boxes), supply and installation of exposed aluminum piping, electrical bundling, supply and installation of electrical cabling, shallow foundation, supply and installation of poles and metallic structures, as well as supply and installation of solar power system (stationary batteries, electronic charge controller and solar photovoltaic module) and supply and installation of dimmable LED luminaires in the Waterway Terminal of Guanabara Bay, on Governador Island, with completion in October/2015.
Technical Capability Certification [PDF - 1.557kb]
Photos Ilha D'Água --- Photos Ilha Redonda
Client: Petrobras Distribuidora S/A. - BR Distribuidora
Budget: approximately US$4.370.000,00
Deadline: 540 days
Construction of the new administrative building and of the new sentry box, buildings renovation (driver's room and concierge), including earthwork, pile driving with helical screw piles, reinforced concrete infra and superstructure, masonry, coatings, wood and aluminum frames, linings and raised floors, metallic roofing, hydrosanitary, electrical, voice and data installations, rainwater drainage, atmospheric discharge protection system (SPDA), paving and urbanization, as well as the construction and assembly of the automatic additivation system for aviation kerosene (QAV), including the construction of shelter and pump bases (metal structure with cover), kerosene lines, electrical and automation system, and their respective interconnections, among others, construction and assembly of the new lighting network, including all the infrastructure (piping junction boxes and cabling), bases and installations of metal poles with mixed luminaires, as well as installation of a fire fighting system network, including the infrastructure (HDPE piping and junction boxes), at the Betim Terminal - TEBET, with completion in June/2015.
Client: Transportadora Associada de Gás S/A. – TAG
Budget: approximately US$880.000,00
Deadline: 240 days
Project and construction of the headquarters house renovation, including access ramp and stairs, replacement of ceramic walls/floor and coating in wood panelling, inspection/replacement of frames and installation of wooden guardrails, internal and external painting, inspection/replacement of the hydrosanitary and electrical installations, gutter system and rainwater harvesting, inspection/replacement of the mission tiles on the roof, as well as, design and construction of forest nurseries, including, preparation and landfill of the site, concrete drills foundation, basement beam, metallic structure, wall lining and cover with shading material screens (sombrite), reinforced concrete partition walls of the beds, irrigation system, rainwater drainage, lightning rod and gravel pavement, at INEA - Forest Garden of Guaratiba, with completion in May/2015.
Client: Lanxess Elastômeros do Brasil S/A.
Budget: approximately US$6.250.000,00
Project, construction, expansion and renovation services (*) of industrial units, administrative buildings (offices) and operational support (cafeteria / auditorium / control rooms / truck scales / fitness center / internal and industrial safety / hospitals / laboratories ), concrete bases for static and dynamic equipment, treatment plants, industrial ducts and common areas (paving, water, sewage and electric networks, fencing), as well as the concrete structural recovery, at the Duque de Caxias Plant, accumulated in contracts between May 2009 and November 2016.
(*) Earthmoving and leveling, manual and mechanical demolition of masonry and concrete structures, reinforced concrete/metallic infra and superstructures, for buildings, sheds, concrete bases for static and dynamic equipment and industrial ducts, finishing services (masonry / floor and walls coating / painting / partition walls / linings / frames / hardware), building installations - electrical, plumbing and sanitary, paving (concrete / paving stone / asphalt), infrastructure networks (electrical, water, fire, sanitary sewage, pluvial and greasy drainage, and industrial waste), roofs (fibercement / fiberglass and aluminum tiles), waterproofing (asphalts and aluminum membranes), special coatings, urbanization (fencing), installation of metal anchors and equipment grout.
Technical Capability Certification 2009 [PDF - 2,117kb]
Technical Capability Certification 2010 [PDF - 2.982kb]
Technical Capability Certification 2016 [PDF - 1.664kb] --- Photos
Client: Petróleo Brasileiro S/A. - Petrobras
Budget: approximately US$3.600.000,00
Deadline: 259 days
Project and renovation services of Shed 60, of transform it into administrative offices, including, among others, demolition and removal services, foundation and concrete bases for equipment, masonry, floor and wall coatings, partitions, linings and raised floors, aluminum and wood frames, roof , hydrosanitary facilities (including benches, bathroom fittings and metals), electrical, voice and data, pluvial drainage, atmospheric discharge protection system (SPDA), fire detection and fire fighting system, ventilation and air conditioning system, complete furniture for administrative offices, urbanization, as well as project and construction of shed for the waste storage central, including foundation, infrastructure, reinforced concrete floor slab, metallic superstructure and cover, hydrosanitary and electrical installations, pluvial drainage, atmospheric discharge protection system (SPDA) , concrete blocks walls bays and urbanization, at the Inhaúma Shipyard, in Cajú, with completion in June/2013.
Client: Petróleo Brasileiro S.A. - Petrobras
Budget phase I: approximately US$3.120.000,00
Deadline phase I: 320 days
Budget phase II: approximately US$4.950.000,00
Deadline phase II: 840 days
Project, construction and assembly services of 13 reinforced/prestressed concrete bridges, including, among others, project services (hydraulic, geometrical and structural) and construction (pile driving - root and metallic piles, infra and superstructure of reinforced concrete molded "in loco", and precast prestressed, bridges assembly, drainage networks, earthmoving, paving, retaining walls and urbanization) for access of equipment and pipelines vehicles (heavy trucks) needed for the construction of GASDUC III, in Cachoeiras de Macacu - Phase I completion in April/2009 and Phase II completion in December/2012.
Technical Capability Certification 2008 [PDF - 3.754kb] --- Photos 2008
Technical Capability Certification 2010 [PDF - 1.301kb] --- Photos 2010
Client: Lanxess Elastômeros do Brasil S.A.
Budget: approximately US$600.000,00
Deadline: 300 days
Project, construction and assembly of mixed structure (metallic/reinforced concrete) of containment wall for area 13 canal closing, including, among others, the services of temporary barrier (cofferdam), submerged drilling and concrete extraction, metallic pile driving, precast reinforced concrete plates, special injectable resins and organic sludge dredging at the Duque de Caxias Plant - completion in September/2012.
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$710.000,00
Deadline: 140 days
Construction and handling services of 600 pieces of reinforced concrete used to support vessels during their maintenance and renovations, at the Inhaúma Shipyard in Cajú - conclusion in June/2012.
Client: Petrobras Transporte S.A. - Transpetro
Budget: approximately US$2.980.000,00
Deadline: 420 days
Project, construction and assembly services of the new road access to the Campos Elíseos Terminal, including renovation, expansion and adaptation of the layout and sentry house cover, control room and bathrooms, paving of access roads and parking lots, expansion of the hydrosanitary networks system, pluvial drainage, electrical, voice and data, and urbanization, at TECAM - Campos Elíseos, Duque de Caxias - conclusion in September/2011.
Technical Capability Certification [PDF - 2.181kb] --- Photos
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$2.480.000,00
Deadline: 720 days
Construction and assembly services for the new banking area, including, among other services, earthmoving, paving, urbanization, water and sewage networks, pluvial drainage, electrical, CCTV/telecommunications and building of the installations central (structure and finishing) at the Duque de Caxias Refinery - REDUC, in Campos Elíseos, Duque de Caxias - conclusion in November/2010.
Client: Petrobras Distribuidora S.A. - BR
Budget: approximately US$310.000,00
Deadline: 210 days
Construction services (expansion and renovation) of the bathrooms in the laboratory building, including, among others, reinforced concrete infra (pile driving) and superstructure services, building installations and all finishing services at the Duque de Caxias Industrial Management Lubricants Factory - completion in September/2010.
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$1.550.000,00
Deadline: 520 days
Construction services of fencing with Nylofor grating, including reinforced concrete base and CCTV network infrastructure, in the perimeter of the Duque de Caxias Refinery - REDUC, Campos Elíseos, Duque de Caxias - completion in April/2010.
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$1.925.000,00
Deadline: 220 days
Project, construction and assembly services, including, among others, earthmoving services, infrastructure (pile driving, blocks and belts) and superstructure (slab) of administrative and operational buildings, and external networks, as well as project and construction of reinforced/prestressed concrete bridges, at the expansion area of the Campos Elíseos Terminal, Duque de Caxias - completion in January/2009.
Technical Capability Certification [PDF - 1.028kb] --- Photos
Client: Petroflex Indústria e Comércio S.A.
Budget: approximately US$3.940.000,00
Project, construction, expansion and renovation services (*) of industrial units, administrative buildings (offices) and operational support (cafeteria / auditorium / control rooms / truck scales / fitness center / internal and industrial safety / hospitals / laboratories ), concrete bases for static and dynamic equipment, treatment plants, industrial ducts and common areas (streets, nets, fencings), as well as the concrete maintenance, structural recovery and reinforcement at the Duque de Caxias Plant, accumulated in contracts between February 2003 and January 2009.
(*) Earthmoving and leveling, manual and mechanical demolition of masonry and concrete structures, reinforced concrete/metallic infra and superstructures, for buildings, sheds, concrete bases for static and dynamic equipment and industrial ducts, finishing services (masonry / floor and walls coating / painting / partition walls / linings / frames / hardware), building installations - electrical, plumbing and sanitary, paving (concrete / paving stone / asphalt), infrastructure networks (electrical, water, fire, sanitary sewage, pluvial and greasy drainage, and industrial waste), roofs (fibercement / fiberglass and aluminum tiles), waterproofing (asphalts and aluminum membranes), special coatings, urbanization (fencing), installation of metal anchors and equipment grout.
Technical Capability Certification - Miscellaneous services [PDF - 1.991kb]
Technical Capability Certification - Maintenance [PDF - 1.312kb]
Technical Capability Certification 2003-2005 - Concrete Structures [PDF - 426kb]
Technical Capability Certification 2006-2007 [PDF - 2.805kb]
Technical Capability Certification 2008-2009 [PDF - 1.890kb]
Client: Petróleo Brasileiro S.A. - Petrobras
Budget: approximately US$810.000,00
Deadline: 160 days
Project, construction and assembly of the Virtual Reality and Videoconference Room, including, among others, finishing services (coatings, frames, painting, furniture), installations and supply and assembly of 3D projection equipment at the Duque de Caxias Refinery - conclusion in October/2008.
Client: Suzano Petroquímica S.A.
Budget: approximately US$190.000,00
Deadline: 60 days
Construction services (Pile driving 500 mm diameter - 860 m / Concrete Bases / Concrete coating of basins and dikes) - February/2006.
Client: Petroflex Indústria e Comércio S.A.
Budget: approximately US$240.000,00
Deadline: 90 days
Construction services (Concrete Structure - Foundation / Walls and Slabs / Paving and Pluvial Drainage) - October/2005.
Client: Consórcio Lummus Andrômeda. (Responsible for Rio Polímeros S.A. factory construction)
Budget: approximately US$1.320.000,00
Deadline: 180 days
Construction services, including, among others, earthmoving and leveling, manual and mechanical demolition of masonry and concrete structures, concrete bases for equipment and gutters with lids (form / frame and concrete), industrial waste storage, canal coated with sprayed concrete, protection net and wire mesh fencing - Petrobras standard, Installation of Metal Anchors and Equipment Grout, Acid Resistant Special Coating, Pavement (Concrete / Paving stone / Asphalt), Lay Out changes, Waterproofing (Asphaltic and Aluminum Membranes) - March/2005.
Technical Capability Certification [PDF - 1.321kb] --- Photos
Client: Petroflex Indústria e Comércio S.A.
Budget: approximately US$910.000,00
Deadline: 180 days
Construction services (Pile driving 260/330 mm diameter – 860 m / 4 storey concrete structure - with 500 m² - slabs / Cooling Tower / Concrete Bases for Tanks - 10 un and Equipment / Paving and Industrial Waste and Rainwater Drainage / Electrical Envelopes) - February/2005.
Technical Capability Certification [PDF - 1.570kb] --- Photos
Client: Polibrasil Resinas S.A.
Budget: approximately US$570.000,00
Deadline: 120 days
Construction services (Pile driving 260 mm diameter - 2000 m / Concrete bases / Earthmoving - landfill - 10.000 m³, ...) and supply, manufacture and assembly of metallic structures (75 tons) - January/2004.
Client: BR Distribuidora
Budget: approximately US$100.000,00
Deadline: 60 days
Supply, manufacture and assembly of metal structures (27 tons) for the fall arrest system in several areas of the Duque de Caxias Lubricants Plant (Industrial Management) - October/2003.
Client: Megatranz
Budget: approximately US$225.000,00
Deadline: 60 days
Several construction and bridge structural reinforcement services, to guarantee the transportation of special loads (equipment up to 500 tons) to be installed at Rio Polímeros S.A - Gas/Chemical Pole of Duque de Caxias - May/2003.
Technical Capability Certification [PDF - 1.096kb] --- Photos
Client: Polibrasil Resinas S.A.
Budget: approximately US$145.000,00
Deadline: 05/02/2003 a 05/06/2003
Several construction services for building a waste disposal shed - mixed structure (reinforced concrete/metallic) and metallic roofing, construction of a water and oil separator, a propylene storage area and a fire brigade training camp. Expansion of the maintenance workshop and adaptation work of the compressor and sub-station house.
Client: Petroflex Indústria e Comércio S.A.
Budget: approximately R$329.000,00
Deadline: 01/02/2000 a 01/12/2000
Several construction services for reinforced concrete structural recovery, at the Synthetic Rubber Finishing area - 2000.